Stuck in the Bathroom

For the last two weeks I have been stuck in the bathroom and have hardly left. There from the morning until midnight most nights, and rarely a moment to eat. What has happened to me? Some exotic disease or a severe case of the runs? Nope. Building.

From virtually nothing we have made a bathroom in only a few weeks. Most of the time I have been working alone on the project, although at times Fabian and others have come along to help out. Their help has been invaluable. The following photos tell more of a story of the development of this new part of the Prayer House…

Preparing cement
Tues 11th: Gabriel and Juan Pablo prepare the concrete for the roof.

Getting it to the roof
Tues 11th: Helping get it up to the roof.

Fabian on the roof
Tues 11th: Fabian loads the roof with concrete over the foam bricks.

Tiling the shower
Tues 18th: Nothing beats matches as a gap measurer for tiling.

Fabian tiling the walls
Tues 18th: Fabian tiling the shower walls.

Putting in the window
Wed 19th: Putting in the window. It is held there by cement.
Grouting the tiles
Thu 20th: Grouting the shower walls.

Lorena painting
Thu 20th: Lorena helps with painting the walls (yep, white walls).

Ernesto putting in the dividing wall
Thu 20th: Ernesto puts the dividing wall in between the shower and the bathroom.

There are more photos of how the whole thing looks as it is mostly finished… but I forgot to take them. Doh. They will come in another post later on as tomorrow I am heading towards Peru (also another post yet to come).