Last Bathroom Photos

These are the latest pics of the bathroom, just before I left Puerto Madryn on my way to Peru. The shower floor is still not done, and there is a huge kink in my main sewage pipe which I made while trying to replace a broken T-joint. The problem was that my friend who knew how to do it was not with me at the time and so it ended up flattened.

Flattened Pipe
The flattened pipe. Doh!

The business end of the bathroom
The business end of the bathroom.

The shower floor (unfinished)
The shower floor still needs to be tiled yet.

The ceiling (also unfinished)
The ceiling will be finished with plasterboard.

The windows already fitted
My first window that I have ever fitted is working perfectly.

From the house area
Looking through from the main house area to the bathroom.

The outside of the bathroom
The outside of the bathroom with an 800 litre water tank on top.

Keeping Busy in the Bathroom

During these last two weeks I have hardly spoken to anybody, have slept very little, have not been near town, and have had my emails piling up without being answered. What has caused me to be so involved? A bathroom.

The bathroom walls
Plumbing and preparing the walls.

Nope, I am not talking about diarrhoea or anything like that. We are currently building a bathroom – the last part of the Prayer House that needs to be done before it is completely finished. As everybody is heading off to Peru or Bariloche within the next two weeks, there is very little time left to get it finished.

Starting from scratch
The base of the bathroom – our starting point only a few weeks ago.

So I now have a goal of having the bathroom completed to operational stage by this next Friday. There may be a few extra details to finish after that, but it needs to be ready to use by then. Once it is in use we can finish off the details with more leisure.

Right now the walls are rendered but need their finishing coats, the electrical cables are installed but are awaiting the painting of the walls first, the floor is poured but needs to be raised with a small wall for the shower areas, and the roof is in place but needs concrete poured into it. A wall for the water tank needs to be built on top of the roof too, and the final plumbing sorted out, plus floor and wall tiling.

Bringing home stuff on the bike
Necessity drives… bringing needed items home by bike.

In reading the things written down here it sounds like there is a fair bit to do, but there are a bunch of people helping me out and based on the progress of last week I believe it is possible. So after today we are going to be going flat-out on it until it is done. And then I can rest.

The Plumbing

Preparing walls for pipes
Gabriel prepares the walls for the water pipes.

Marking the pipes
Marking the pipes for cutting.

Cutting the waterpipes
Cutting the waterpipes with my new grinder/cutter.

Connecting to the mains water supply
Juan Pablo helps me connect to the mains water supply.

Preparing the Roof

Danny helping with the roof
Danny helps us to lift up the concrete beams to the roof.

Gaby helping out with the roof
Gaby helps me to lay the beams on the roof.

Placing the beams
Placing the beams on the roof with Gaby.

Paul preparing the roofing beams.
Paul cuts the dags off the roofing beams.

Rendering the Walls

Rendering the walls with concrete
Rendering the final part of one wall.

Fabian helping render the walls
Fabian helps tremendously with rendering the walls.

Juan Pablo helping out
Juan Pablo helps mix the concrete for the walls.

Other Related Stuff

Getting sand
To get the rocks and sand that we need, we make trips down to the local dry creek bed and bring it back one wheelbarrow at a time.

Vicky painting
Vicky helps out by painting the main front door.

Paul making holes in the wall
Paul helps me prepare the electrical installations.

Juan Pablo with cement smile
Juan Pablo waiting for the next call for cement.

Purchased stuff
Water tank, floor and wall tiles, cement and cal – all needed for the bathroom.

More purchased stuff
A full house – foam roof bricks, toilet and lots of tools needed for the bathroom.