During these last two weeks I have hardly spoken to anybody, have slept very little, have not been near town, and have had my emails piling up without being answered. What has caused me to be so involved? A bathroom. The bathroom walls Plumbing and preparing the walls. Nope, I am not talking about diarrhoea or anything like that. We are currently building a bathroom - the last part of the Prayer House that needs to be done before it is completely finished. As everybody is heading off to Peru or Bariloche within the next two weeks, there is very little time left to get it finished. Starting from scratch The base of the bathroom - our starting point only a few weeks ago. So I now have a goal of having the bathroom completed to operational stage by this next Friday. There may be a few extra details to finish after that, but it needs to be ready to use by then. Once it is in use we can finish off the details with more leisure. Right now the walls are rendered but need their finishing coats, the electrical cables are installed but are awaiting the painting of the walls first, the floor is poured but needs to be raised with a small wall for the shower areas, and the roof is in place but needs concrete poured into it. A wall for the water tank needs to be built on top of the roof too, and the final plumbing sorted out, plus floor and wall tiling. Bringing home stuff on the bike Necessity drives... bringing needed items home by bike. In reading the things written down here it sounds like there is a fair bit to do, but there are a bunch of people helping me out and based on the progress of last week I believe it is possible. So after today we are going to be going flat-out on it until it is done. And then I can rest. The Plumbing Preparing walls for pipes Gabriel prepares the walls for the water pipes. Marking the pipes Marking the pipes for cutting. Cutting the waterpipes Cutting the waterpipes with my new grinder/cutter. Connecting to the mains water supply Juan Pablo helps me connect to the mains water supply. Preparing the Roof Danny helping with the roof Danny helps us to lift up the concrete beams to the roof. Gaby helping out with the roof Gaby helps me to lay the beams on the roof. Placing the beams Placing the beams on the roof with Gaby. Paul preparing the roofing beams. Paul cuts the dags off the roofing beams. Rendering the Walls Rendering the walls with concrete Rendering the final part of one wall. Fabian helping render the walls Fabian helps tremendously with rendering the walls. Juan Pablo helping out Juan Pablo helps mix the concrete for the walls. Other Related Stuff Getting sand To get the rocks and sand that we need, we make trips down to the local dry creek bed and bring it back one wheelbarrow at a time. Vicky painting Vicky helps out by painting the main front door. Paul making holes in the wall Paul helps me prepare the electrical installations. Juan Pablo with cement smile Juan Pablo waiting for the next call for cement. Purchased stuff Water tank, floor and wall tiles, cement and cal - all needed for the bathroom. More purchased stuff A full house - foam roof bricks, toilet and lots of tools needed for the bathroom.