For the last two weeks I have been stuck in the bathroom and have hardly left. There from the morning until midnight most nights, and rarely a moment to eat. What has happened to me? Some exotic disease or a severe case of the runs? Nope. Building. From virtually nothing we have made a bathroom in only a few weeks. Most of the time I have been working alone on the project, although at times Fabian and others have come along to help out. Their help has been invaluable. The following photos tell more of a story of the development of this new part of the Prayer House... Preparing cement Tues 11th: Gabriel and Juan Pablo prepare the concrete for the roof. Getting it to the roof Tues 11th: Helping get it up to the roof. Fabian on the roof Tues 11th: Fabian loads the roof with concrete over the foam bricks. Tiling the shower Tues 18th: Nothing beats matches as a gap measurer for tiling. Fabian tiling the walls Tues 18th: Fabian tiling the shower walls. Putting in the window Wed 19th: Putting in the window. It is held there by cement. Grouting the tiles Thu 20th: Grouting the shower walls. Lorena painting Thu 20th: Lorena helps with painting the walls (yep, white walls). Ernesto putting in the dividing wall Thu 20th: Ernesto puts the dividing wall in between the shower and the bathroom. There are more photos of how the whole thing looks as it is mostly finished... but I forgot to take them. Doh. They will come in another post later on as tomorrow I am heading towards Peru (also another post yet to come).